Construction Safety Engineering Principles (McGraw-Hill Construction Series)
Step 1. Download Adobe Digital Editions Both PC and Mac users will need to download Adobe Digital Editions to access their eBook. You can download Adobe Digital Editions at Adobe's website here.
Step 2. Register an Adobe ID if you do not already have one. (This step is optional, but allows you to open the file on multiple devices) Visit account.Adobe.com to register your Adobe account.
Step 3: Authorize Adobe Digital Editions using your Adobe ID. In Adobe Digital Editions, go to the Help menu. Choose “Authorize Computer.”
Step 4: Open your file with Adobe Digital Editions. Once you’ve linked your Adobe Digital Editions with your Adobe ID, you should be able to access your eBook on any device which supports Adobe Digital Editions and is authorized with your ID. If your eBook does not open in Adobe Digital Editions upon download, please contact customer service
AcknowledgmentsIntroductionPart I: Development of the Five Principles for Safety Design in ConstructionChapter 1: Principle One: Definition of a HazardChapter 2: Principle Two: The Standard of CareChapter 3: Principle Three: Categories of HazardsChapter 4: Principle Four: The Safe Design Hierarchy to Physically Control HazardsChapter 5: Principle Five: Control the Hazard with the Appropriate Design Improvement or ApplianceChapter 6: Reliability: A Method to Evaluate Probable Safety PerformancePart II: Examples of Engineering ControlChapter 7: Crane HazardsSection 1: Two-BlockingSection 2: Crane Upset from OverloadSection 3: Jib-Boom Stowage on Hydraulic CranesSection 4: Latticework Boom DisassemblySection 5: Crane Operator Protection from Upset to Falling ObjectsSection 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Part I: Development of the Five Principles for Safety Design in ConstructionChapter 1: Principle One: Definition of a HazardChapter 2: Principle Two: The Standard of CareChapter 3: Principle Three: Categories of HazardsChapter 4: Principle Four: The Safe Design Hierarchy to Physically Control HazardsChapter 5: Principle Five: Control the Hazard with the Appropriate Design Improvement or ApplianceChapter 6: Reliability: A Method to Evaluate Probable Safety PerformancePart II: Examples of Engineering ControlChapter 7: Crane HazardsSection 1: Two-BlockingSection 2: Crane Upset from OverloadSection 3: Jib-Boom Stowage on Hydraulic CranesSection 4: Latticework Boom DisassemblySection 5: Crane Operator Protection from Upset to Falling ObjectsSection 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Chapter 2: Principle Two: The Standard of CareChapter 3: Principle Three: Categories of HazardsChapter 4: Principle Four: The Safe Design Hierarchy to Physically Control HazardsChapter 5: Principle Five: Control the Hazard with the Appropriate Design Improvement or ApplianceChapter 6: Reliability: A Method to Evaluate Probable Safety PerformancePart II: Examples of Engineering ControlChapter 7: Crane HazardsSection 1: Two-BlockingSection 2: Crane Upset from OverloadSection 3: Jib-Boom Stowage on Hydraulic CranesSection 4: Latticework Boom DisassemblySection 5: Crane Operator Protection from Upset to Falling ObjectsSection 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Chapter 4: Principle Four: The Safe Design Hierarchy to Physically Control HazardsChapter 5: Principle Five: Control the Hazard with the Appropriate Design Improvement or ApplianceChapter 6: Reliability: A Method to Evaluate Probable Safety PerformancePart II: Examples of Engineering ControlChapter 7: Crane HazardsSection 1: Two-BlockingSection 2: Crane Upset from OverloadSection 3: Jib-Boom Stowage on Hydraulic CranesSection 4: Latticework Boom DisassemblySection 5: Crane Operator Protection from Upset to Falling ObjectsSection 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Chapter 6: Reliability: A Method to Evaluate Probable Safety PerformancePart II: Examples of Engineering ControlChapter 7: Crane HazardsSection 1: Two-BlockingSection 2: Crane Upset from OverloadSection 3: Jib-Boom Stowage on Hydraulic CranesSection 4: Latticework Boom DisassemblySection 5: Crane Operator Protection from Upset to Falling ObjectsSection 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Chapter 7: Crane HazardsSection 1: Two-BlockingSection 2: Crane Upset from OverloadSection 3: Jib-Boom Stowage on Hydraulic CranesSection 4: Latticework Boom DisassemblySection 5: Crane Operator Protection from Upset to Falling ObjectsSection 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 2: Crane Upset from OverloadSection 3: Jib-Boom Stowage on Hydraulic CranesSection 4: Latticework Boom DisassemblySection 5: Crane Operator Protection from Upset to Falling ObjectsSection 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 4: Latticework Boom DisassemblySection 5: Crane Operator Protection from Upset to Falling ObjectsSection 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 6: Powerline ContactChapter 8: Other Equipment HazardsSection 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 1: Electronic-News-Gathering Van Powerline ContactSection 2: ConveyorsSection 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 3: Skid-Steer Front-End Loader and Rough-Terrain Telescoping-Boom Forklift Side UpsetSection 4: TrucksSection 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 5: Aerial LiftsSection 6: Unsafe Restraint SystemsSection 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 7: Equipment Leasing Chapter 9: Universal HazardsSection 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 1: Killer HooksSection 2: Blind ZonesSection 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 3: Dangerous Nuts, Bolts, Pins, and Other ConnectorsSection 4: Unsafe Control SystemsSection 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 5: Guarding of Moving PartsSection 6: Noisy Equipment and MachinesPart II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Part II: Examples of Engineering ControlSection 7: MoldSection 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 8: DustSection 9: VentilationSection 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 10: Pinch PointsSection 11: Compressed GasesSection 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 12: Hazardous Secondary VoltagesChapter 10: Access HazardsSection 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 1: Fall PreventionSection 2: Fall ProtectionSection 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 3: Falling ObjectsSection 4: LaddersSection 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 5: Dangerous Access to EquipmentSection 6: Traffic ControlSection 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 7: Haul RoadsChapter 11: Types of Construction HazardsSection 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 1: Wood-Frame ConstructionSection 2: Concrete Form WorkSection 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 3: Masonry FailuresSection 4: Tilt-UpSection 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 5: Lift SlabsSection 6: Steel ErectionSection 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 7: TrenchingSection 8: TunnelingSection 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 9: Diving/Underwater ConstructionChapter 12: Operation and Maintenance HazardsSection 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 1: Fire PreventionSection 2: Confined SpacesSection 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 3: LightingSection 4: Toxic Fumes and GasesSection 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 5: Wind and FloodingSection 6: SanitationPart III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Part III: Mechanics of Inherently Safer DesignChapter 13: Including Safety into Design PlanningSection 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Section 1: Architectural Design PlanningSection 2: Equipment Design PlanningChapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Chapter 14: Including Safety into Construction PlanningSection 1: Construction Safety PlanningChapter 15: The Economics of Inherently Safer DesignINDEX
Chapter 15: The Economics of Inherently Safer DesignINDEX
Identify and Control Safety Hazards on Construction Sites to Reduce Worker Injuries and Increase Productivity
Construction Safety Engineering Principles: Designing & Managing Safer Job Sites equips architects, engineers, and construction managers with a step-by-step methodology for identifying and controlling hazards before construction starts. The book explains how to look beyond the utility of machinery and equipment to how they will actually be used on a construction site_and thereby spot potential hazards in advance.
Safety expert David MacCollum presents examples of the 50 most common construction hazards, showing how they can be eliminated by means of proven design techniques and technologies. He explains how to prevent falls from elevations with safe access systems, get rid of blind zones behind mobile equipment, utilize control systems that cannot be unintentionally activated, avoid crane accidents, and much more. Packed with detailed illustrations, Construction Safety Engineering Principles enables construction professionals to:
- Design and plan safer construction sites for residential, commercial, and industrial projects
- Correct safety problems before construction begins
- Dramatically reduce costly worker injuries and job delays
- Increase productivity and create a more cost-effective project
Improve Safety Conditions on Any Construction Site!
•Hazard Definition (Dormant, Armed, or Active) • Hazard Prevention through Design Features and Safety Appliances • Hazard Categories (Natural, Structural/Mechanical, Electrical, Chemical, Radiant Energy, Biological, Automated) • Safe Design Hierarchy • Hazard Identification and Prevention Matrix • Crane Hazards • Other Equipment Hazards • Universal Hazards • Access Hazards • Types of Construction • Operation and Maintenance • Planning • Including Safety in the Design • Including Safety in the Master Construction Plan • Economics of Safer Design